TEMPORARY WORK SOLUTIONS
Solutions for various temporary works activities around the site. Such as crane erection and dismantling, hoist, site mobilization plan, formwork and scaffolding and any other temporary work material.
CONSTRUCTION PHASING
From the design stage to the execution stage of the project we assist our client in defining the construction phases for the various temporary works element.
​
​
2D&3D Presentation
Following the basic phasing, as per the client’s requirements, a 2D or 3D presentation is produced, showing the site development, including the temporary works (i.e. tower cranes, hoists, etc.) as well as the actual building, along the timeline of the project.
​
METHOD STATEMENTS
Issuing and follow-up the method statements for the temporary works related activities until approved by the client and issued to site.
​
​
​
​
STRUCTURE OPTIMIZATION
We can help you with optimizing the structure for the construction phase. If in the structural design the optimization is focused on savings on the structural elements, we go further by considering the costs of the temporary/construction phase in the equation.
FINANCIAL REVIEW
As the price of the materials is a component of the total cost, we strive to consider all the elements to find the overall cost for the client.
Between the different financial solutions such as purchase, purchase + buy-back, rental or mixed and between different systems and solutions, considering the full costs, meaning actual price for the system, manpower, consumables, lost items, accessories and the duration of assembling, dismantling and moving the materials.
Taking the best financial decision requires a comprehensive comparison, putting in balance the advantages/disadvantages of the different solutions, considering the global costs, time-frame, geographic location and return policies. As the price of the materials is but a component of the total cost, we strive to consider all the elements in order to find the overall cost for the client.
STRUCTURE STUDY
Studying the structure in the tendering phase and proposing, wherever possible, an optimization with regards to its constructibility, saving thus time, manpower and materials. Defining the methods used for building the structure.
PLANNING & SEQUENCING
Realistic high-level phasing is developed in correlation with the planning of the project.
QUANTITY TAKEOFF
Analysing the structural drawings and specifications and preparing an approximate bill of quantities for individual members.
SITE MANAGEMENT
Materials inspections on delivery. Follow up on the system for checking scaffolding by a 3rd party, and a striking permit system in order to cast the slabs.
Constant coordination between the different trades regarding the temporary works.